Description

This project provides for the repair of existing storm drain outfalls into stream valleys. Design of corrective measures is included when in-kind replacement of original outfall structures is not feasible. Candidate outfall repairs are selected from citizen and public agency requests. The Department of Environmental Protection's (DEP) Miscellaneous Stream Valley Improvements project generates and assists in rating the outfalls, which are identified as that project expands into additional watersheds.
anchor

Phase

Ongoing

Status

Active
anchor
Budget Snapshot
$14.52M Total
Expenditures/Funding
$5.54M 6 Year Total
Expenditures/Funding
anchor

Justification

Collapsed storm drain pipe sections, undermined endwalls, and eroded outfall channels create hazardous conditions throughout the County. The course of drainage could be altered endangering private property or public roads and speeding the erosion of stream channels. Erosion from damaged outfalls results in heavy sediment load being carried downstream that can severely impact aquatic ecosystems and exacerbate existing downstream channel erosion. As part of its watershed restoration inventories, DEP identifies storm drain outfalls that are in need of repair in County stream valleys and respective watersheds. As this program expands to include additional watersheds, each outfall is categorized and, where damaged, rated. A functional rating and evaluation process is used to prioritize each outfall.
anchor

Other

The number of outfall locations being repaired per year varies based on the severity of the erosion and damage, the complexity of the design, and the complexity of the needed restorative construction work. Completed outfalls in FY20-21: Bennington Drive, Margate Road, Hatherleigh Drive, Glen Road, Loxford Road, Pebble Beach Lane, Whisperwood Road, Buttonwood Lane, Brandyhall Lane, Hollyoak Court, Lamberton Road. Potential Outfalls projects in FY22-23: Georgian Forest Park, Crosby Road, Vandever Street, Garrett Park Road, Lily Stone Drive, and Littleton Street.
anchor

Fiscal Note

In FY23-FY28, long-term financing based on the Maryland Water Quality Revolving Loan Fund (WQRLF) from the Maryland Department of Environment (MDE) was replaced with Water Quality Protection Bonds due to limited eligibility of projects within this CIP under the revolving fund. FY22 amendment to reduce Long-Term Financing and replace it with Water Quality Protection Bonds. FY23 funding switch between Long-Term Financing and Current Revenue: WQPC to fund expenditures incurred in FY19 under the MDE loan that will not materialize and reprogramming of expenditures originally under CR:WQPC with WQPC Bonds.

anchor

Disclosures

A pedestrian impact analysis has been completed for this project. Expenditures will continue indefinitely.
anchor

Coordination

Montgomery County Department of Environmental Protection, Maryland-National Capital Park and Planning Commission, Maryland Department of the Environment, United States Army Corps of Engineers, Montgomery County Department of Permitting Services, Utility Companies, and Miscellaneous Stream Valley Improvements (CIP No. 807359).
Budget Snapshot
$14.52M Total
Expenditures/Funding
$5.54M 6 Year Total
Expenditures/Funding
anchor
Project Details
Project NumberP509948
Date Last Modified01/03/23
Administering AgencyTransportation
CategoryConservation of Natural Resources
SubCategoryStorm Drains
Planning AreaCountywide
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY22Rem FY22Total 6 YearsFY 23FY 24FY 25FY 26FY 27FY 28Beyond 6 Years
Planning, Design and Supervision562032968022443743743743743743740
Land1212000000000
Site Improvements and Utilities00000000000
Construction88905590033005505505505505505500
Other33000000000
Total Expenditures1452589018055449249249249249249240
FUNDING (000s)
Funding SourceTotalThru FY22Rem FY22Total 6 YearsFY 23FY 24FY 25FY 26FY 27FY 28Beyond 6 Years
Current Revenue: Water Quality Protection2879121515215121922642642642642640
G.O. Bonds53575357000000000
Long-Term Financing11481220-7200000000
Water Quality Protection Bonds51411109040327326606606606606600
Total Funding Sources1452589018055449249249249249249240
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 23 Request1848
Year First AppropriationFY99
Appropriation FY 24 Request0
Last FY's Cost Estimate14525
Cumulative Appropriation10829
Expenditure / Encumbrances8988
Unencumbered Balance1841