up
Budget Year / Version:  
anchor
anchor
anchor

Description

This project provides for the design, construction, and maintenance of vehicular and pedestrian traffic signals and signal systems including new and existing signals, reconstruction/replacement of aged and obsolete signals and components, auxiliary signs; accessible pedestrian signals (APS), upgrades of the County's centrally-controlled computerized traffic signal system, and communications and interconnect into the signal system. $150,000 is included each fiscal year for the installation of accessible pedestrian signals at five intersections to improve pedestrian safety for persons with disabilities. This will provide more easily accessible, raised buttons to press when crossing the road and audio cues to indicate when it is safe to cross. The planning, design and construction of school beacons will provide a remote connection for the beacons that enhances communication so that equipment monitoring and programming changes for the flashers may be accomplished faster and remotely without having to physically access the devices.
anchor

Phase

Ongoing

Status

Active
anchor
Budget Snapshot
$89.52M Total
Expenditures/Funding
$34.52M 6 Year Total
Expenditures/Funding
anchor

Cost Change

Cost increase due to inflation and the addition of FY29 and FY30.
anchor

Justification

The growth in County population and vehicular registrations continues to produce increasing traffic volumes. Additionally, population growth results in the need for goods and services, contributing to higher vehicle volumes. The resulting increases raise traffic congestion levels and contribute to the increase in the number of vehicle crashes. Managing traffic growth and operations on the County transportation network requires a continued investment in the traffic signal system to increase intersection safety; accommodate changes in traffic patterns and roadway geometry; reduce intersection delays, energy consumption, and air pollution; and provide coordinated movement on arterial routes through effective traffic management and control, by utilizing modern traffic signal technologies. Studies include the Traffic Signal Inspection and Assessment Program (2016), the Infrastructure Maintenance Task Force (2010), and the Pedestrian Safety Initiative (2007), which all identified traffic signals in need of life-cycle replacement as funding is available.
anchor

Other

This project will help the County achieve its Vision Zero goals to reduce deaths and serious injuries on County roadways resulting from vehicle crashes to zero by 2030. Approximately 60 projects are completed annually by a combination of contractual and County work crews. One aspect of this project focuses on improving pedestrian walkability by creating a safe walking environment, utilizing selected engineering technologies, and ensuring Americans with Disabilities Act (ADA) compliance. All new and reconstructed traffic signals are designed and constructed to include appropriate pedestrian features - crosswalks, curb ramps, accessible pedestrian/countdown pedestrian signals (APS/CPS), and applicable signing. Additionally, pedestrian hybrid beacons (PHB) are employed at midblock pedestrian crossings or designated intersections to provide a safe, protected crossing. A significant portion of the traffic signal work will continue to be in the central business districts and other commercial areas, where costs are higher due to more underground utilities and congested work areas. Likewise, new signals in outlying, developing areas are more expensive due to longer runs of communication cable. Since FY97, the fiber optic interconnection of traffic signals has been funded through the Fibernet project.
anchor

Fiscal Note

FY24 supplemental in State Aid for the amount of $1,200,000. FY24 supplemental in CR: General for $184,788.
anchor

Disclosures

A pedestrian impact analysis will be performed during design or is in progress. Expenditures will continue indefinitely. The County Executive asserts that this project conforms to the requirement of relevant local plans, as required by the Maryland Economic Growth, Resource Protection and Planning Act.
anchor

Coordination

Advanced Transportation Management System, Verizon, FiberNet CIP (No. 509651), Maryland State Highway Administration, Potomac Electric Power Company, Washington Gas and Light, Washington Suburban Sanitary Commission, Montgomery County Pedestrian Safety Advisory Committee, and Citizens Advisory Boards, and Maryland-National Capital Park and Planning Commission.
Budget Snapshot
$89.52M Total
Expenditures/Funding
$34.52M 6 Year Total
Expenditures/Funding
anchor
Project Details
Project NumberP507154
Date Last Modified01/08/24
Administering AgencyTransportation
CategoryTransportation
SubCategoryTraffic Improvements
Planning AreaCountywide
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Planning, Design and Supervision280012240764449508258258258258258250
Land1919000000000
Site Improvements and Utilities58306221946544295684928492849284928492849280
Construction7878000000000
Other31121912120000000000
Total Expenditures89516466108388345185753575357535753575357530
FUNDING (000s)
Funding SourceTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Current Revenue: General185018500000000
G.O. Bond Premium186186000000000
G.O. Bonds79499381386843345185753575357535753575357530
Recordation Tax Premium (MCG)82868286000000000
State Aid13600136000000000
Total Funding Sources89516466108388345185753575357535753575357530
OPERATING BUDGET IMPACT ($000s)
Impact TypeTotal 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30
Maintenance270152739516375
Energy51626507498122146
Program-Staff810909090180180180
NET IMPACT1596131167203329365401
Full Time Equivalent (FTE) 111222
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 25 Request5753
Year First AppropriationFY71
Appropriation FY 26 Request5753
Last FY's Cost Estimate77338
Cumulative Appropriation54998
Expenditure / Encumbrances47956
Unencumbered Balance7042