anchor Description
This project is intended to fund all activities needed for construction of repair sub-projects for stormwater management (SWM) facilities and stream restoration assets that are beyond the scope of the routine maintenance funded by the operating budget programs but are not so large or extensive as to be prioritized under the Major Structural Repair project (P800700). These repairs generally require engineered design and sediment control plans and other permitting like Major Structural Repair sub-projects, but the scope of work is greatly reduced in scale. It is the intent of this project to fund all activities needed for construction of the repairs, including engineered design, permitting, construction, and construction management.
The intent of this project is to protect and enhance the functioning of these assets to protect water quality, increase the asset's useful life, and avoid costly repairs in the future. Work on the SWM facilities includes small scale dredging projects that increase the useful life of the asset and ensure that it functions as designed. Work is identified through DEP's triennial inspection program which assures that all SWM facilities under County jurisdiction are inspected and maintained, as required by State law, County law, and the County's MS4 Permit. Stream restoration smaller-scale repairs are also identified in inspections which rank severity and issues with erosion, installed structures, and riparian vegetation. Repairs may include removing debris blockages negatively impacting stream banks, or design, permitting, and construction management of small spot repairs to protect stream banks, infrastructure, and stream habitat. This work takes place in all areas of the County, assuring water resources protection for all Montgomery County constituents. This work will also provide some climate change resiliency by addressing the sediment erosion impacts of more severe storms.
anchorCost Change
Cost increase to reflect larger scope of work plus the addition of FY31 and FY32 to this level-of-effort project.
anchorFiscal Note
FY27 fund switch to reduce Current Revenue: WQP and increase WQP Bonds by $793,000.
anchorDisclosures
Expenditures will continue indefinitely.
anchorCoordination
Department of Transportation, Maryland-National Capital Park and Planning Commission, Maryland Department of Natural Resources