Description

This project provides for the restoration of, or improvements to, Silver Spring parking facilities to address deterioration due to use and age. This is a continuing program of contractual improvements or restorations, with changing priorities depending upon the types of deterioration and corrections required. Corrective measures are required to ensure adequate and proper serviceability over the design life of the facilities and to preserve the County's investment. The scope of this project may vary depending on the results of the studies conducted under facility planning. The project will protect or improve the physical infrastructure to assure continuation of safe and reliable parking facilities. Included are annual consultant services to provide investigation, analysis, recommend repair methods, contract documents, inspection, and testing, if required.
project image
anchor

Phase

Ongoing

Status

Active
anchor
Budget Snapshot
$30.32M Total
Expenditures/Funding
$16.67M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Cost Change

Reductions and delays due to affordability.
anchor

Justification

Staff inspection and condition surveys by County inspectors and consultants indicate that facilities in the Silver Spring Parking Lot District (PLD) are in need of rehabilitation and repair work. Not performing this restoration work within the time and scope specified may result in serious structural integrity problems to the subject parking facilities as well as possible public safety hazards.
anchor

Other

Major sub-projects within this ongoing effort are as follows:
  • Elevator replacements at Garages on Kennett St., Wayne Ave., and at the Town Square.
  • Storm-drain valve replacements at Garage 2 Spring-Cameron, and Garage 7 Cameron.
anchor

Fiscal Note

Garage 60 generator replacement is delayed three years with completion in FY25. Other improvements to Silver Spring garages are delayed two years with costs incurred in FY23 through FY26.
anchor

Disclosures

Expenditures will continue indefinitely.
anchor

Coordination

Silver Spring PLD Facility Planning.
Download & Explore
Budget Snapshot
$30.32M Total
Expenditures/Funding
$16.67M 6 Year Total
Expenditures/Funding
project image
anchor
Project Details
Project NumberP508250
Date Last Modified05/25/21
Administering AgencyTransportation
CategoryTransportation
SubCategoryParking
Planning AreaSilver Spring and Vicinity
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY20Rem FY20Total 6 YearsFY 21FY 22FY 23FY 24FY 25FY 26Beyond 6 Years
Planning, Design and Supervision56013801018003003003003003003000
Land3333000000000
Site Improvements and Utilities11481148000000000
Construction227667895014871356143018953070401041100
Other776776000000000
Total Expenditures3032413653016671656173021953370431044100
FUNDING (000s)
Funding SourceTotalThru FY20Rem FY20Total 6 YearsFY 21FY 22FY 23FY 24FY 25FY 26Beyond 6 Years
Current Revenue: Parking - Silver Spring3032413653016671656173021953370431044100
Total Funding Sources3032413653016671656173021953370431044100
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 21 Request0
Year First AppropriationFY83
Appropriation FY 22 Request0
Last FY's Cost Estimate35124
Cumulative Appropriation21220
Expenditure / Encumbrances15281
Unencumbered Balance5939