This project provides for the replacement of the existing Glen Road Bridge over Sandy Branch. The existing bridge, built in 1930 and repaired in 1992, is a 12-foot long single span concrete slab structure with concrete abutments and wingwalls. The bridge provides a 21'-7" wide clear roadway. The proposed replacement bridge includes a single span box culvert carrying an 18'-0" roadway and a 2'-0" shoulder on each side. The project includes approach roadway work at each end of the bridge to tie into the existing roadway. The bridge and road will be closed to traffic during construction. Accelerated bridge construction techniques will be utilized to minimize the disruption to the traveling public and local community.
anchor

Phase

Preliminary Design Stage

Status

New
anchor
Budget Snapshot
$3.54M Total
Expenditures/Funding
$3.54M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Capacity

The roadway Average Daily Traffic (ADT) is approximately 3,846 and the roadway capacity will not change as a result of this project.
anchor

Estimated Schedule

The design of the project is expected to finish in the spring of 2021. Construction is scheduled to start in summer 2022 and be completed in fall of 2022. The bridge will be closed to traffic from June 2022 to August 2022 for construction.
anchor

Justification

The proposed replacement work is necessary to provide a safe roadway condition for the travelling public. The 2015 bridge inspection report for Bridge No. M-0148X01 indicates that there are concrete spalls on the north fascia, and at the northeast corner of the soffit. There is a 6" diameter x 2" deep spall with exposed reinforcement adjacent to the west abutment. There is a 3'-0" long hairline crack with minor spalling up to 2" high and delamination in the northwest wing wall interface with the north fascia. There is a 2.5" deep spall and full height vertical fracture in the southeast wing wall interface with the east abutment. The bridge is currently posted for a 26,000 lbs. limit for a single-unit truck and a 26,000 lbs. limit for a combination-unit truck. Implementation of this project would allow the bridge to be restored to full capacity. The 2002 Potomac Subregion Master Plan designates Glen Road as Rustic Road (R-2) from Query Mill Rd to Piney Meetinghouse Rd with two travel lanes and minimum right-of-way width 70 feet.
anchor

Other

The design costs for this project are covered in the "Bridge Design" project (C.I.P. No. 509132).
anchor

Fiscal Note

Since the existing bridge is less than 20-foot long, construction and construction management costs for this project are not eligible for Federal Aid.
anchor

Disclosures

A pedestrian impact analysis has been completed for this project.
anchor

Coordination

Maryland State Highway Administration, Maryland Department of the Environment, Maryland National Capital Park and Planning Commission , Montgomery County Department of Permitting Services, Utilities, and Bridge Design Project CIP 509132.
Download & Explore
Budget Snapshot
$3.54M Total
Expenditures/Funding
$3.54M 6 Year Total
Expenditures/Funding
anchor
Project Details
Project NumberP502102
Date Last Modified01/07/20
Administering AgencyTransportation
CategoryTransportation
SubCategoryBridges
Planning AreaTravilah and Vicinity
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY19Est FY20Total 6 YearsFY 21FY 22FY 23FY 24FY 25FY 26Beyond 6 Years
Planning, Design and Supervision5990059901354640000
Land10001010000000
Site Improvements and Utilities9850098504874980000
Construction1946001946049814480000
Other00000000000
Total Expenditures354000354010112024100000
FUNDING (000s)
Funding SourceTotalThru FY19Est FY20Total 6 YearsFY 21FY 22FY 23FY 24FY 25FY 26Beyond 6 Years
G.O. Bonds354000354010112024100000
Total Funding Sources354000354010112024100000
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 21 Request10
Year First Appropriation
Appropriation FY 22 Request3530
Last FY's Cost Estimate0
Cumulative Appropriation0
Expenditure / Encumbrances0
Unencumbered Balance0