This project provides for pedestrian and bicycle improvements for dual bicycle facilities (on-road and off-road) and enhanced, continuous pedestrian facilities along Seven Locks Road from Montrose Road to Bradley Boulevard (3.3 miles) plus a bike path on Montrose Road between Seven Locks Road and the I-270 ramp, plus northbound and eastbound auxiliary through lanes with on-road bike lanes at the intersection of Seven Locks Road and Tuckerman Lane. The project is broken down into three phases: Phase I provides dual bikeway and pedestrian facilities for the segment of Seven Locks Road from Montrose Road to Tuckerman Lane including the bike path on Montrose and the improvements to the Tuckerman Lane intersection. Phase II provides a dual bikeway and pedestrian facilities for the segment of Seven Locks Road from Tuckerman Lane to Democracy Boulevard. Phase III provides a dual bikeway and pedestrian facilities for the segment of Seven Locks Road from Democracy Boulevard to Bradley Boulevard.
project image
anchor

Phase

Preliminary Design Stage

Status

Active
anchor
Budget Snapshot
$26.76M Total
Expenditures/Funding
$0M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Estimated Schedule

$500,000 was provided in Facility Planning: Transportation CIP Project (#509337) in FY21 to refresh conceptual design to comply with the latest Complete Street Design Guide. Project components are scheduled to commence beyond six years.
anchor

Justification

This project is needed to address bicycle facility disconnects along Seven Locks Road. The roadway lacks adequate north-south, on-road/off-road bicycle facilities necessary to provide continuity and connection between existing and future bike facilities. Continuous bicycle and pedestrian facilities are needed to allow safe access to residential, retail and commercial destinations, as well as existing religious and educational and facilities. Plans and studies include: 2002 Potomac Sub-Region Master Plan; 2018 Countywide Bikeways Master Plan and MCDOT Facility Planning Phase I & II
anchor

Other

Costs are based on preliminary design. Construction costs will be updated during the design phase. This project currently provides funding for Phase I improvements only. The project will help the County achieve its Vision Zero goals to reduce deaths and serious injuries on County Roadways to zero by 2030. A facility planning refresh was completed in FY22 to determine changes needed to meet current pedestrian and bicycle guidelines. Though the proposed width of the roadway has decreased, the proposed width of the pedestrian and bicycle facilities has increased per the Complete Street Design Guide, and therefore, the overall typical section remains largely the same throughout the project limits.
anchor

Fiscal Note

The total estimated cost of the project for all three phases is approximately $70 million, including design, land acquisition, site improvements, utility relocation, and construction. The project can be built in phases to better absorb cost and financial constraints.
anchor

Disclosures

A pedestrian impact analysis has been completed for this project.
anchor

Coordination

Maryland-National Capital Park and Planning Commission, Department of Permitting Services, Pepco, Verizon, Washington Gas, Washington Suburban Sanitary Commission; Special Capital Projects Legislation will be proposed by the County Executive.
Budget Snapshot
$26.76M Total
Expenditures/Funding
$0M 6 Year Total
Expenditures/Funding
project image
anchor
Project Details
Project NumberP501303
Date Last Modified01/07/24
Administering AgencyTransportation
CategoryTransportation
SubCategoryPedestrian Facilities/Bikeways
Planning AreaTravilah and Vicinity
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Planning, Design and Supervision39720000000003972
Land47660000000004766
Site Improvements and Utilities378000000000378
Construction1764400000000017644
Other00000000000
Total Expenditures2676000000000026760
FUNDING (000s)
Funding SourceTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
G.O. Bonds2676000000000026760
Total Funding Sources2676000000000026760
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 25 Request0
Year First Appropriation
Appropriation FY 26 Request0
Last FY's Cost Estimate26760
Cumulative Appropriation0
Expenditure / Encumbrances0
Unencumbered Balance0