Description

This project provides for the replacement of the existing Dennis Avenue Bridge M-0194 over a tributary to Sligo Creek. The existing bridge, built in 1961, is a single 30-foot span structure composed of pre-stressed concrete voided slabs carrying a 24-foot roadway, two 6-foot shoulders, and two 5'-8" sidewalks. The proposed replacement bridge includes a single 75-foot span structure carrying a 24-foot roadway, two 6-foot shoulders, and two 7-foot sidewalks. The project includes approach roadway work at each end of the bridge as necessary to tie-in to the existing roadway. The bridge and road will be closed to traffic during construction. Accelerated bridge construction techniques will be utilized to minimize the disruption to the traveling public and local community.
project image
anchor

Phase

Planning Stage

Status

Active
anchor
Budget Snapshot
$5.61M Total
Expenditures/Funding
$5.57M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Capacity

The roadway Average Daily Traffic (ADT) is approximately 14,000 and the roadway capacity will not change as a result of this project.
anchor

Estimated Schedule

The design of the project is expected to finish in the spring of 2021. Land will be purchased in 2021. Construction is scheduled to start in spring 2022 and be completed in summer 2022. Dennis Avenue will be closed to vehicular traffic during the summer of 2022.
anchor

Justification

The proposed replacement work will mitigate the frequent flooding of five residential properties and local streets upstream of the bridge; mitigate occasional roadway flooding on Dennis Avenue that causes significant traffic delays; and eliminate annual maintenance repairs required for this deteriorating structure. The existing bridge is rapidly deteriorating and is nearing the end of its estimated service life.
anchor

Other

The 1989 Kensington-Wheaton Master Plan designates Dennis Avenue as Arterial (A-59) with a minimum right-of-way of 80 feet. The County Bikeways Functional Masterplan designates Dennis Avenue as a signed, shared roadway (SR-55). Streetlights, crosswalks, sidewalk ramps, bikeways and other pertinent issues are being considered in the design of the project to ensure pedestrian safety.
anchor

Disclosures

A pedestrian impact analysis will be performed during design or is in progress.
anchor

Coordination

Montgomery County Department of Environmental Protection, Maryland Department of the Environment, Maryland National Capital Park and Planning Commission, Montgomery County Department of Permitting Services, Utilities, Wheaton Regional Dam Flooding Mitigation (CIP Project #801710)
Download & Explore
Budget Snapshot
$5.61M Total
Expenditures/Funding
$5.57M 6 Year Total
Expenditures/Funding
project image
anchor
Project Details
Project NumberP501701
Date Last Modified02/13/18
Administering AgencyTransportation
CategoryTransportation
SubCategoryBridges
Planning AreaKensington-Wheaton
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY18Rem FY18Total 6 YearsFY 19FY 20FY 21FY 22FY 23FY 24Beyond 6 Years
Planning, Design and Supervision76053572060604016040000
Land10000100000100000
Site Improvements and Utilities10000010000000100000
Construction37500037500001000275000
Other00000000000
Total Expenditures561053555706060401260415000
FUNDING (000s)
Funding SourceTotalThru FY18Rem FY18Total 6 YearsFY 19FY 20FY 21FY 22FY 23FY 24Beyond 6 Years
Federal Aid3270003270000720255000
G.O. Bonds23405352300606040540160000
Total Funding Sources561053555706060401260415000
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 19 Request40
Year First Appropriation
Appropriation FY 20 Request0
Last FY's Cost Estimate5610
Cumulative Appropriation200
Expenditure / Encumbrances5