Description

This project provides for the replacement of the existing Park Valley Road Bridge over Sligo Creek and realignment of the nearby existing Sligo Creek Hiker/Biker Trail. The replacement Park Valley Road Bridge will be a 34 foot single span simply supported prestressed concrete slab beam structure carrying a 26 feet clear roadway, a 5 foot 8 inches wide sidewalk on the south side, and an 8 inches wide curb on the north side for a total clear bridge width of 32 feet 4 inches. An approximately 85 foot long approach roadway and an approximately 85 foot long sidewalk connector will be reconstructed to tie the bridge to the existing roadway and trail. The realignment of the nearby existing hard surface Sligo Creek Hiker/Biker Trail will include a new 12 foot wide, 65 foot long single span simply supported prefabricated steel truss pedestrian bridge over Sligo Creek, plus a new 10 foot wide approximately 213 foot long hard surface trail to tie the new pedestrian bridge to the existing trail, plus reconfiguration of the existing substandard mini circle Park Valley Road/Sligo Creek Parkway intersection to a regular T-intersection with a new crosswalk and a new 6 foot wide refuge median on Park Valley Road for the new trail. A new 5 foot wide, approximately 190 foot long natural surface pedestrian path will be constructed along the existing hard surface trail. Also, a parking lot will be removed at the northwest of the Park Valley Road Bridge.
project image
anchor

Phase

Final Design Stage

Status

Pending Closeout
anchor
Budget Snapshot
$4.85M Total
Expenditures/Funding
$0M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Capacity

Upon completion, the Average Daily Traffic [ADT] on the Park Valley Road Bridge will remain under 1,100 vehicles per day.
anchor

Estimated Schedule

This project is complete and is awaiting reimbursement from the Maryland Department of Transportation.
anchor

Justification

The existing Park Valley Road Bridge, built in 1931, is a 30 foot single span structure carrying a 20 foot clear roadway and a 5 foot wide sidewalk on the south side, for a total clear bridge width of 25 feet 9 inches. The 2013 inspection revealed that the concrete deck and abutments are in very poor condition. This bridge is considered structurally deficient. The bridge has posted load limits of 30,000 lb. The trail realignment is necessary to maintain pedestrian/bicycle access during construction of the replacement Park Valley Bridge, improve pedestrian/bicycle safety and accessibility of the Sligo Creek hiker/biker trail in the vicinity of Park Valley Road, and enhance the trail in compliance with ADA requirements.The reconfigured T-intersection will improve traffic safety and provide better access for school buses and fire-rescue apparatus.
anchor

Other

Park Valley Road is classified as a secondary residential roadway in the East Silver Spring Master Plan. The road will be closed and vehicular traffic will be detoured during construction. Right-of-way acquisition is not required. The construction will be implemented in two phases. Phase 1: Construct the intersection reconfiguration, new pedestrian bridge and hiker/biker trail realignment. Pedestrian/bicycle access will be maintained through the existing Park Valley Road Bridge. Phase 2: Construct the replacement of the Park Valley Road Bridge and approach roadway pavement. Pedestrian/bicycle access will be maintained through the new pedestrian and hiker/biker trail.
anchor

Fiscal Note

The costs of construction and construction management for the replacement of the Park Valley Road Bridge and associated approach work are eligible for up to 80 percent Federal Aid. The cost of construction and construction management for the realignment of the nearby existing Sligo Creek Hiker/Biker Trail, including the new pedestrian bridge, new trail and reconfiguration of the intersection are eligible for up to 80 percent federal funds by transportation alternatives program. The construction and construction management for the new natural surface pedestrian path will be 100 percent General Obligation Bonds. In FY18, $270,000 in GO Bonds was transferred from the Piney Meetinghouse Road Bridge project (P501522). In FY18, Council approved a supplemental appropriation to add $630,000 in Federal Aid. FY23 funding switch of $337,000 from Federal Aid to Impact Taxes to reflect FY22 actuals.
anchor

Disclosures

A pedestrian impact analysis has been completed for this project.
anchor

Coordination

Bridge Design Project CIP 509132, FHWA - Federal Aid Bridge Replacement/Rehabilitation Program, FHWA - Transportation Alternatives Program, Maryland State Highway Administration, Maryland Department of the Environment, Maryland-National Capital Prak And Planning Commission, Montgomery County Department of Permitting Services
Budget Snapshot
$4.85M Total
Expenditures/Funding
$0M 6 Year Total
Expenditures/Funding
project image
anchor
Project Details
Project NumberP501523
Date Last Modified12/21/23
Administering AgencyTransportation
CategoryTransportation
SubCategoryBridges
Planning AreaTakoma Park
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Planning, Design and Supervision5895266300000000
Land00000000000
Site Improvements and Utilities3003000000000
Construction423141498200000000
Other00000000000
Total Expenditures4850467517500000000
FUNDING (000s)
Funding SourceTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Federal Aid32053205000000000
G.O. Bonds1308113317500000000
Impact Tax337337000000000
Total Funding Sources4850467517500000000
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 25 Request0
Year First AppropriationFY15
Appropriation FY 26 Request0
Last FY's Cost Estimate4850
Cumulative Appropriation4850
Expenditure / Encumbrances4722
Unencumbered Balance128