Description

This flood mitigation project, located along Glenhaven Drive and Dennis Avenue in Wheaton, will excavate and expand the stream channel upstream of the Wheaton Regional Pond and modify the pond's riser structure. This project will be constructed in parallel with the Department of Transportation's (DOT) Dennis Avenue bridge replacement. The two projects will modify the current 100-year floodplain boundary just upstream of the pond. The post-project 100-year floodplain will not include the residential properties located in the current 100-year floodplain.
project image
anchor

Phase

Planning Stage

Status

Active
anchor
Budget Snapshot
0 M Total
Expenditures/Funding
0 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Estimated Schedule

The riser modification and channel design began in FY18 with the riser repair construction expected to start in FY27 and conclude in FY28. The excavation of the channel will occur in coordination with DOT's culvert replacement in FY26.
anchor

Cost Change

Increase to Long Term Financing to align with an expected loan from the Maryland Department of Emergency Management.
anchor

Justification

An engineering analysis by the Department of Environmental Protection indicates that the effect of the riser structure associated with the Wheaton Regional Pond, the Dennis Avenue Culvert, and an undersized stream channel along Glenhaven Drive, cumulatively, will cause flooding of roads and private property upstream of the pond during a 100-year storm event. Flooding of adjacent roads and private property has already occurred in 2006 and 2010.
anchor

Fiscal Note

In FY26, the funding source was updated to remove Water Quality Protection Bonds and State Aid and replace it with a low-interest loan from the Maryland Department of Emergency Management. In addition, a fund switch moved $179,000 in previously expended WQP Bonds to Current Revenue; Water Quality Protection. In FY25, $989,000 in Current Revenue: Water Quality Protection replaced that amount of Water Quality Bonds. In FY24, State Aid increased $96,000 to reflect a State grant for tree planting, with an offsetting reduction in Water Quality Protection Bonds.
anchor

Disclosures

The County Executive asserts that this project conforms to the requirement of relevant local plans, as required by the Maryland Economic Growth, Resource Protection and Planning Act.
anchor

Coordination

Department of Transportation, Federal Emergency Management Agency, Maryland Emergency Management Agency, Dennis Ave Bridge M-0194 Replacement (No. 501701)
Download & Explore Project Details
Budget Snapshot
0 M Total
Expenditures/Funding
0 6 Year Total
Expenditures/Funding
project image
anchor
Project NumberP801710
Date Last Modified04/15/26
Administering AgencyEnvironmental Protection
CategoryConservation of Natural Resources
SubCategoryStormwater Management
Planning AreaKensington-Wheaton
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
FUNDING (000s)
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY27 Request299
Year First AppropriationFY16
Appropriation FY28 Request0
Last FY's Cost Estimate4776
Cumulative Appropriation4776
Expenditure / Encumbrances1222
Unencumbered Balance3554