Description

This project provides for the replacement of the existing Glen Road Bridge over Sandy Branch. The existing bridge, built in 1930 and repaired in 1992, is a 12-foot long single span concrete slab structure with concrete abutments and wingwalls. The bridge provides a 21'-7" wide clear roadway. The proposed replacement bridge includes a two cell box culvert with a total span of 21'-0" carrying an 18'-0" roadway and a 2'-0" shoulder on each side. The project includes approach roadway work at each end of the bridge to tie into the existing roadway. The project also includes 200ft of stream restoration. The bridge and road will be closed to traffic during construction. Accelerated bridge construction techniques will be utilized to minimize the disruption to the traveling public and local community.
anchor

Phase

Preliminary Design Stage

Status

Active
anchor
Budget Snapshot
$4.58M Total
Expenditures/Funding
$4.38M 6 Year Total
Expenditures/Funding
anchor

Location

anchor

Capacity

The roadway Average Daily Traffic (ADT) is approximately 3,846 and the roadway capacity will not change as a result of this project.
anchor

Estimated Schedule

Design is expected to be completed in the summer of 2023. Construction is scheduled to begin in summer 2024 and complete in fall of 2024. The bridge will be closed to traffic from June 2024 to August 2024 for construction.
anchor

Cost Change

Cost increase due to additional design and construction required to reduce frequency of flooding of Glen Road.
anchor

Justification

The proposed replacement work is necessary to provide a safe roadway condition for the travelling public. The 2015 bridge inspection report for Bridge No. M-0148X01 indicates that there are concrete spalls on the north fascia, and at the northeast corner of the soffit. There is a 6" diameter x 2" deep spall with exposed reinforcement adjacent to the west abutment. There is a 3'-0" long hairline crack with minor spalling up to 2" high and delamination in the northwest wing wall interface with the north fascia. There is a 2.5" deep spall and full height vertical fracture in the southeast wing wall interface with the east abutment. The bridge is currently posted for a 26,000 lbs. limit for a single-unit truck and a 26,000 lbs. limit for a combination-unit truck. Implementation of this project would allow the bridge to be restored to full capacity. The 2002 Potomac Subregion Master Plan designates Glen Road as Rustic Road (R-2) from Query Mill Rd to Piney Meetinghouse Rd with two travel lanes and minimum right-of-way width 70 feet.
anchor

Other

The design costs for this project are partially covered in the "Bridge Design" project (C.I.P. No. 509132).
anchor

Fiscal Note

Since the existing bridge is less than 20-foot long, construction and construction management costs for this project are not eligible for Federal Aid.
anchor

Disclosures

A pedestrian impact analysis has been completed for this project.
anchor

Coordination

Maryland State Highway Administration, Maryland Department of the Environment, Maryland National Capital Park and Planning Commission , Montgomery County Department of Permitting Services, Utilities, and Bridge Design Project CIP 509132.
Download & Explore
Budget Snapshot
$4.58M Total
Expenditures/Funding
$4.38M 6 Year Total
Expenditures/Funding
anchor
Project Details
Project NumberP502102
Date Last Modified01/14/22
Administering AgencyTransportation
CategoryTransportation
SubCategoryBridges
Planning AreaTravilah and Vicinity
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY22Rem FY22Total 6 YearsFY 23FY 24FY 25FY 26FY 27FY 28Beyond 6 Years
Planning, Design and Supervision1150121889503002004500000
Land500050104000000
Site Improvements and Utilities9850098504855000000
Construction24000024000100014000000
Other00000000000
Total Expenditures4585121884385310172523500000
FUNDING (000s)
Funding SourceTotalThru FY22Rem FY22Total 6 YearsFY 23FY 24FY 25FY 26FY 27FY 28Beyond 6 Years
G.O. Bonds4585121884385310172523500000
Total Funding Sources4585121884385310172523500000
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 23 Request0
Year First AppropriationFY21
Appropriation FY 24 Request1045
Last FY's Cost Estimate4585
Cumulative Appropriation3540
Expenditure / Encumbrances581
Unencumbered Balance2959