Description

This program will provide for the replacement of failed storm drain pipes and culverts. The County's storm drain infrastructure is aging and many of the metal pipe culverts installed from 1960 through the 1990's have reached the end of their service life. An asset inventory with condition assessments has been developed to better forecast future replacement needs. Going forward, funding will be programmed for both systematic and emergency replacement of these pipes and culverts. Program scope includes: storm water pipe and culvert replacement of both metal and concrete less than six (6) feet in roadway longitudinal length; headwalls, end sections, replacement, or extension of culverts to assure positive flow of stormwater and channeling of stormwater into existing ditch lines or structures. Repairs also include roadside pipe and culvert end treatment safety improvements to eliminate safety hazards. This project will not make major changes to the location or size of existing storm drainage facilities. Structures greater than six-feet-roadway-longitudinal length are repaired under the Bridge Renovation Program (CIP No. 509753).
anchor

Phase

Ongoing

Status

Active
anchor
Budget Snapshot
$31.19M Total
Expenditures/Funding
$11.29M 6 Year Total
Expenditures/Funding
anchor

Cost Change

The funding level for this level of effort project has been increased to account for inflation and to add FY29 and FY30 funding to this ongoing program.
anchor

Justification

This program will address emergency pipe replacements of aging metal and concrete pipes that have reached the end-of-their-service life. The result of these pipe failures has been deep depressions, sinkholes, sediment build-up, open pipe joints, and metal pipe inverts to an unacceptable levels. Existing storm drain conditions are extremely poor. Repairs are needed to improve safety and reduce the potential for hazards and associated public inconvenience. Failure of a storm drain pipe will precipitate emergency repairs at much higher prices. Furthermore, this program provided funding towards developing an asset inventory of the storm drain system including pipe and culvert conditions that helps forecast future funding requirements.
anchor

Fiscal Note

Funding switches in FY25 and FY26 between Water Quality Protection Bonds and Current Revenue Water Quality Protection Charge to use available fund balance. Maryland Water Quality Revolving Loan Fund (WQRLF) from the Maryland Department of Environment (MDE) was replaced with Water Quality Protection Bonds due to limited eligibility of projects within this CIP under the revolving fund.
anchor

Disclosures

Expenditures will continue indefinitely.
anchor

Coordination

WSSC Water, Washington Gas, Montgomery County Department of Permitting Services, Pepco, Cable TV, Verizon, Montgomery County Public Schools, Regional Service Centers, Community Association's, Commission on People With Disabilities, Maryland Department of Environment, Montgomery County Department of Environmental Protection, and United States Army Corps of Engineers.
Download & Explore
Budget Snapshot
$31.19M Total
Expenditures/Funding
$11.29M 6 Year Total
Expenditures/Funding
anchor
Project Details
Project NumberP501470
Date Last Modified01/09/24
Administering AgencyTransportation
CategoryConservation of Natural Resources
SubCategoryStorm Drains
Planning AreaCountywide
anchor
Total Expenditures by Cost Element (000s)
anchor
Total Funding by Source (000s)
EXPENDITURES (000s)
Cost ElementsTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Planning, Design and Supervision3774163760715302552552552552552550
Land00000000000
Site Improvements and Utilities00000000000
Construction2741516203145197611581163616361636163616360
Other22000000000
Total Expenditures31191178422058112911836189118911891189118910
FUNDING (000s)
Funding SourceTotalThru FY23Est FY24Total 6 YearsFY 25FY 26FY 27FY 28FY 29FY 30Beyond 6 Years
Current Revenue: Water Quality Protection125369000035361836170000000
G.O. Bonds15001500000000000
Water Quality Protection Bonds17155734220587755019118911891189118910
Total Funding Sources31191178422058112911836189118911891189118910
APPROPRIATION AND EXPENDITURE DATA ($000s)
Appropriation FY 25 Request1836
Year First AppropriationFY14
Appropriation FY 26 Request1891
Last FY's Cost Estimate26700
Cumulative Appropriation19900
Expenditure / Encumbrances18182
Unencumbered Balance1718