anchor Description
This project provides for the replacement/major repair of roofs and entrance canopies on buildings at all three campuses, including the addition of roof insulation as part of the replacement work. Project costs are based on comprehensive roof surveys of all College buildings completed in An update to this survey was completed in
anchor Justification
The College has implemented a roof replacement/renovation program to respond to the aging of building roofs. The program provides for the periodic evaluation of roofs on a four year cycle. The current roof replacement/major repair schedule delineates specific building projects.. Roofs requiring major renovation are generally ten years or older in age. In the initial replacement cycle, approximately of the construction cost is for the addition of roof insulation on each building. Added insulation results in an average five year payback due to reduced energy costs and lower replacement costs of mechanical equipment retrofits in building renovations. This project is coordinated with the College's building renovation program and with the replacement of major roof-top building equipment. Related studies include the Montgomery College Strategic Plan Collegewide Roof Surveys Update a Collegewide Facilities Condition Assessment and the Collegewide Master Plan (Pending
anchorOther
Appropriation: (G.O. Bonds). Appropriation: (G.O. Bonds). By County Council Resolution the cumulative project appropriation was reduced by in In addition, the State share was reduced by in and project funding was current revenue. funding was current revenue and State aid. No appropriations were made to this project in and In funding was changed to G.O Bonds and State aid. State aid applies only to roof replacement design and construction. Roof surveys are County G.O. Bond funded. In in G.O. Bonds was reallocated from the Bioscience Education Center project and in G.O. Bonds were reallocated from the Science West Building Renovation project In in G.O. Bonds reallocated from the Germantown Bioscience Education Center project and reallocated from Science West Building Renovation The following fund transfer has been made into this project: from the Planned Asset Replacement project Res. The following fund transfers have been made to this project: from Site Improvements (BOT Resol.
anchorDisclosures
Expenditures will continue indefinitely.
Montgomery College asserts that this project conforms to the requirement of relevant local plans, as required by the Maryland Economic Growth, Resource Protection and Planning Act.
anchorCoordination
Energy Conservation (CIP No. Planned Lifecycle Asset Replacement: College (CIP No. - Germantown High Technology Building, R-Macklin Tower Building (Terrace only). TPSS Pavilion Pavilion Pavilion Short Term Roof Repairs, Semi Annual Roof Inspections; - R-South Campus Instruction Building, and TPSS Commons Building; - R-Gudelsky Building, and R-Humanities Building; - Rockville Theatre Arts Building, Rockville Technical Center, Germantown Grounds Storage; and - Central Services Building & R-Performing Arts Center.