anchor Description
This flood mitigation project, located along Glenhaven Drive and Dennis Avenue in Wheaton, will excavate and expand the stream channel upstream of the Wheaton Regional Pond and modify the pond's riser structure. This project will be constructed in parallel with the Department of Transportation's (DOT) Dennis Avenue bridge replacement. The two projects will modify the current 100-year floodplain boundary just upstream of the pond. The post-project 100-year floodplain will not include the residential properties located in the current 100-year floodplain.
anchorEstimated Schedule
The riser modification and channel design began in FY18 with the riser repair construction expected to start in FY22. The excavation of the channel will occur in coordination with DOT's culvert replacement in FY23 and FY24.
anchor Justification
An engineering analysis by the Department of Environmental Protection indicates that the effect of the riser structure associated with the Wheaton Regional Pond, the Dennis Avenue Culvert, and an undersized stream channel along Glenhaven Drive, cumulatively, will cause flooding of roads and private property during a 100-year storm event. Flooding of adjacent roads and private property has already occurred in 2006 and 2010. The County is seeking a map revision to the Federal Emergency Management Agency (FEMA) panel for this area to have the 100-year floodplain updated to reflect existing conditions.
anchorFiscal Note
This project will be done in conjunction with the DOT Dennis Avenue bridge replacement project (P501701). The County will also partner with the Maryland Emergency Management Agency (MEMA) to seek FEMA Pre-Disaster Mitigation Grant Program funding for the channel modifications.
anchorCoordination
Department of Transportation, Federal Emergency Management Agency, Maryland Emergency Management Agency, and Dennis Ave Bridge M-0194 Replacement (No. 501701).